Full Design, Project Management & Contract Administration of reinstatement works to timber frame house following serious fire

  • Property:Timber framed dormer bungalow
  • Location:Ilkely, West Yorkshire
  • Client:Private Homeowner
  • Services:
  • An outbreak of fire in the loft of the property, from a faulty light fitting, quickly escalated, resulting in significant fire, smoke and water damage.

Such was the severity of the fire, the two gable walls had to be completely rebuilt, along with the roof structure and entire first floor walls and floor. All kitchen and sanitary fittings required replacing, along with electrical and mechanical services.

We attended site within 3 days of the fire and produced a specification for the reinstatement works required soon after. We produced a tender package and tender report on return of tender documents. We appointed the winning contractor and project managed the works to completion, along with contract administration under the JCT Intermediate contract.

Works were completed to an exacting standard and ahead of programme.  Total value was in the region of £150k.

We work throughout the UK in the insurance reinstatement sector.

extensive fire to house roof
full scaffold to protect from the elements
extent of fire damage revealed