- Property:Primary school
- Location:Wakefield
- Client:Enhance Academy Trust
- Services:Building Pathology
We investigated extensive cracking at a Wakefield primary school for Enhance Academy Trust, tracing the cause to corroding wall ties and setting out the repairs needed to make it safe.
We were appointed by Enhance Academy Trust to investigate extensive horizontal and stepped cracking affecting the external walls of St Michael’s C of E Primary School in Wakefield.
Our service included a detailed inspection of all elevations, a review of an earlier wall tie report, and borescope investigation within the cavity wall construction.
We identified:
- Widespread horizontal fracturing
- Recessed and defective pointing
- Loose and bulging brickwork, particularly to parapets
- Deterioration to reinforced concrete lintels and window sills
We confirmed that both vertical twist and butterfly wall ties had been used and appeared to be suffering from corrosion. The expansion of the corroding ties had lifted the surrounding brickwork, causing cracking through the mortar beds and contributing to local instability — a problem made worse by weak original mortar and shallow previous repointing, which had allowed moisture to penetrate the masonry.
Our report recommended:
- Further wall tie inspections across each elevation
- Replacement of defective ties
- Dismantling and rebuilding of unstable masonry
- Specialist repair of the deteriorated concrete lintels and sills
The outcome gave the Trust a clear understanding of the cause, extent, and safety implications of the defects, together with a practical basis for planning & procuring the necessary remedial works.