Untangling Multiple Moisture Sources in a New Leeds Healthcare Facility

  • Property:Healthcare facility
  • Location:Leeds
  • Client:NHS Trust
  • Services:
  • We investigated mould and staining in a newly completed Leeds mental health facility for an NHS Trust, identifying several distinct moisture sources and the repairs required for each.

Strip out at Leeds mental health clinic

We were appointed by Leeds and York Partnership NHS Foundation Trust to investigate mould, staining, and peeling finishes within a recently completed inpatient mental health facility in Leeds.

Our service included:

  • Reviewing previous technical reports and construction records
  • A detailed inspection of affected bedrooms, bathrooms and service ducts
  • Examining areas exposed during intrusive strip-out works
  • Moisture testing to identify the root causes

We concluded that the principal wall defects were most likely caused by plywood linings having been installed while excessively wet and then sealed behind plasterboard. The trapped construction moisture had subsequently caused mould, staining, delamination and deterioration, particularly at low level where drying was restricted.

We also identified separate defects, including a likely failure in a bathroom vinyl floor joint and moisture affecting internal rainwater pipes within several service ducts, resulting in further staining to surrounding linings.

Our report distinguished between the different moisture sources and provided clear recommendations for:

  • Further opening-up
  • Inspection of bathroom floor finishes
  • Removal of affected materials
  • Investigation and repair of the rainwater pipework

This gave the Trust and contractor an evidence-based route towards targeted remediation and resolution.

Get in touch with our friendly team

    Request a Callback

    Please complete your details in the form below and a member of the Ovolo team will be in touch soon.

    Start typing and press Enter to search

    Shopping Cart